After the water leak was fixed, we ripped out the cabinets to clean out the mildew. Gross. We also found the hidden pineapple wallpaper that matched our lovely pineapple tiles. Puke.

In June, the second half of the deconstruction began. The desk was removed as was the sheet rock. Electrical was run. Studs were leveled. Green rock was hung. Taping, floating, sanding, floating... This weekend: sanding, texturizing, painting... And we laid the rest of the floor boards!!! All that's left is to sand down some uneven edges, touch up the paint, paint and install the door trim, and paint and install the base board and quarter round. It's beautiful!!!






